Case Study
Dekton adords Magnolia, a premium Toledo nightclub
CRD Construction

Location
Toledo, Ohio (USA)
Fabricator / Installer
Toledo Custom Countertops
Material
Dekton
Aplication
Bar top, flooring, vanity top, wall cladding
End date
2024
Architecture / Design
CRD Construction
General Contractor
CRD Construction
Color
Radium, Kelya, Lucid
Thickness
8 mm, 20 mm
Photography
Luettke Studio (Rick Luettke)
Magnolia is Toledo’s new premium nightclub, a place where energy and elegance converge to create unforgettable experiences. The space was carefully designed to be a vibrant and enduring presence in Toldedo’s nightlife scene and provide a lively atmosphere for patrons looking to dance the night away or enjoy a sophisticated evening out on the town.
Magnolia was built with high-end finishes and top-of-the-line equipment, creating a luxurious environment that enhances the client experience. To achieve the desired level of sophistication and high performance, CDR Construction and Toledo Custom Countertops selected Dekton by Cosentino as the surfacing of choice throughout the space. Known for its quality and design, Dekton offers unmatched strength in a variety of low-maintenance colors and patterns that align with the design aesthetic.
Starting with the star of the show: the bar! Dekton Radium, a rustic volcanic rock-inspired color, can be seen on the bar countertop, where drinks will be served and laughs will be had. Additionally, Dekton Radium’s composition is 80% recycled material, making it a sustainable choice as well.
Dekton Kelya can be seen on the wall holding the establishment’s logo and adjacent to a magnolia tree. For some contrast, Dekton Lucid was specified on the bathroom flooring and countertops. Lucid is characterized by its thick gray veinings on white canvas, reminiscent of the world’s most iconic marbles.
Dekton contributes to the magnolia tree-inspired design, a symbol of strength and endurance. Known for its quality, Dekton is ideal for a high-traffic space, ensuring it not only looks stunning but will also stand the test of time.
Cosentino’s materials used in this project
Architecture / Design
Giovanni Gianola, Argine Studio
Color
Sirius, Halo, Keon, Ceppo, Laos, Sabbia, Umber
End date
2024






























