Image of Unidad Central de Preparado ONCE 05 1.jpg?auto=format%2Ccompress&ixlib=php 3.3 in ONCE - Cosentino

ONCE

Cosentino Flagship Project

A Dekton-cladded robotic plant

Domus Arquitectura – Paz Fernández Ovejero

Image of Unidad Central de Preparado ONCE 05 1.jpg?auto=format%2Ccompress&ixlib=php 3.3 in ONCE - Cosentino

Sijainti

Madrid, Espanja

Material

DEKTON

Väri

Soke | Soke Grip | Lunar | Keyla

Määrä

300 m2

Architecture / Design

Domus Arquitectura - Paz Fernández Ovejero

Käyttötarkoitus

Flooring for common areas and bathrooms – Furniture

Päättymispäivä

2019

Paksuus

12 mm

Innovation begins with the surfaces

ONCE Group Spain have commissioned Domus Arquitectos studio to modernise an old industrial building in Camino de Hormigueras, Madrid. The aim of restoring the building is to house the logistics centre of the ONCE printing plant, a cutting-edge robotic plant.

Technology and innovation are the guiding elements of the project. With these two ideas in mind, and without forgetting the visual and functional aspects, the studio has chosen Dekton as the leading material for the different spaces.

Image of Unidad Central de Preparado ONCE 13.jpg?auto=format%2Ccompress&ixlib=php 3.3 in ONCE - Cosentino
Image of Unidad Central de Preparado ONCE 12.jpg?auto=format%2Ccompress&ixlib=php 3.3 in ONCE - Cosentino

Customised cuts to ensure visual continuity

The first visual impact is provided by the building's reception. The combination of Dekton Kelva dark stone, together with the steel and the programmable lighting, creates an overwhelming effect. This effect is intensified by cutting Dekton in large-format, which allows for visual continuity.

The reception desk, made of the same material, becomes a "sculpture". Designed and manufactured by hand, and fully cladded in Dekton, it required precise laser cutting and error-free handling. The result is a monolithic block reminiscent of materials taken from quarries in one piece.

Dekton is also used for flooring in common areas and bathrooms, in 3.2 x 1.4 metre slabs, achieving a striking effect.

Tarvitsetko apua projektissa?

Ota yhteyttä asiantuntijoihimme saadaksesi neuvoja

Tarvitsetko apua projektissa?

Ota yhteyttä asiantuntijoihimme saadaksesi neuvoja

“On the walls, for the assembly of Dekton's pieces, we rely on large formats and lighting reflections to seek continuity”
Domus Arquitectos

Domus Arquitectos

Industrial functionality embracing design

The project consisted of the restoration of an old industrial building to be used for three purposes: the ONCE logistics unit, the administrative control centre for this unit, and a small auditorium for events.

In industrial buildings, design and materials are often neglected for the sake of practical production. However, Domus Arquitectos, in collaboration with the project's construction company, Ferrovial, has gone for a very advanced design in accordance with the machinery to be incorporated in the plant, and for the use of materials with a technological finish. Dekton thus presents itself as a resistant, versatile and design solution for use in industrial environments.

Image of Unidad Central de Preparado ONCE 36.jpg?auto=format%2Ccompress&ixlib=php 3.3 in ONCE - Cosentino

Tässä projektissa käytetyt Cosentinon materiaalit

Soke

Soke

DEKTON
lunar_close_up

Lunar

DEKTON
kelya

Kelya

DEKTON
Image of FOTO@1x.jpg?auto=format%2Ccompress&ixlib=php 3.3 in ONCE - Cosentino

Haluatko tietää Dektonin tarjoamista mahdollisuuksista rakennusten julkisivumateriaalina?

Tags: Cladding, Commercial, Dekton, Flooring | 4 vuotta ago | Written by: Cosentino

Pyydä tarjouksia